Institutional
Client:
Emeritus at Brighton Landing
Category:
Project:
Assisted living facility with 96 residential units, associated parking and a wander garden for dementia care residents, including landscaping, lighting and signage. BME’s stormwater management plan included green infrastructure practices through the use of bio-retention trenches and wet swales. A tree survey was implemented to identify and locate protected species, and a trail connecting with the Town trail network was designed.